PJM-Barrett HVDC (0134)

PJM-Barrett HVDC is a 650.0 MW generation interconnection project with a current status of withdrawn. It is proposed to connect at Barrett 138 kV.

650.0 MWCapacity
WithdrawnStatus
Market
GenerationTechnology

Project facts

Canonical namePJM-Barrett HVDC
Queue ID0134
Statuswithdrawn
Source status0
Market
TechnologyGeneration
Capacity650.0 MW
StateNew York
County
Point of interconnectionBarrett 138 kV
Requested (queue) date2003-05-21
Proposed in-service date
Operational date
Withdrawn date
DeveloperTransEnergie US Ltd.
Utility / transmission ownerLIPA

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata