PJM-Newbridge Rd HVDC (0126)

PJM-Newbridge Rd HVDC is a 350.0 MW other interconnection project with a current status of withdrawn. It is proposed to connect at Newbridge Road 138kV.

350.0 MWCapacity
WithdrawnStatus
—Market
OtherTechnology

Project facts

Canonical namePJM-Newbridge Rd HVDC
Queue ID0126
Statuswithdrawn
Source status0
Market—
TechnologyOther
Capacity350.0 MW
StateNew York
County—
Point of interconnectionNewbridge Road 138kV
Requested (queue) date2002-09-10
Proposed in-service date2006-05-31
Operational date—
Withdrawn date—
DeveloperTransEnergie US Ltd.
Utility / transmission ownerLIPA

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_project—withdrawnhigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.