PJM-Newbridge Rd HVDC (0126)

PJM-Newbridge Rd HVDC is a 350.0 MW other interconnection project with a current status of withdrawn. It is proposed to connect at Newbridge Road 138kV.

350.0 MWCapacity
WithdrawnStatus
Market
OtherTechnology

Project facts

Canonical namePJM-Newbridge Rd HVDC
Queue ID0126
Statuswithdrawn
Source status0
Market
TechnologyOther
Capacity350.0 MW
StateNew York
County
Point of interconnectionNewbridge Road 138kV
Requested (queue) date2002-09-10
Proposed in-service date2006-05-31
Operational date
Withdrawn date
DeveloperTransEnergie US Ltd.
Utility / transmission ownerLIPA

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.