Placid Solar II, LLC (037376)
Placid Solar II, LLC is a 74.9 MW solar interconnection project in Highlands, Florida with a current status of active. It is proposed to connect at Fisheating Creek Substation.
74.9 MWCapacity
ActiveStatus
FLMarket
SolarTechnology
Project facts
| Canonical name | Placid Solar II, LLC |
|---|---|
| Queue ID | 037376 |
| Status | active |
| Source status | — |
| Market | FL |
| Technology | Solar |
| Capacity | 74.9 MW |
| State | Florida |
| County | Highlands |
| Point of interconnection | Fisheating Creek Substation |
| Requested (queue) date | 2019-05-31 |
| Proposed in-service date | 2023-12-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Placid Solar II, LLC |
| Utility / transmission owner | Duke Energy Progress |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28
Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.