Plainfield 2.3 MW Capacity Restoration (CNR Only) (522)

Plainfield 2.3 MW Capacity Restoration (CNR Only) is a 38.5 MW other interconnection project in Windham, Connecticut with a current status of operational. It is proposed to connect at Frybrook substation, 115 KV.

38.5 MWCapacity
OperationalStatus
CTMarket
OtherTechnology

Project facts

Canonical namePlainfield 2.3 MW Capacity Restoration (CNR Only)
Queue ID522
Statusoperational
Source statusC
MarketCT
TechnologyOther
Capacity38.5 MW
StateConnecticut
CountyWindham
Point of interconnectionFrybrook substation, 115 KV
Requested (queue) date2015-02-20
Proposed in-service date
Operational date2015-07-01
Withdrawn date
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata