Plainfield Renewable Energy Project (150)

Plainfield Renewable Energy Project is a 37.5 MW other interconnection project in Windham, Connecticut with a current status of operational. It is proposed to connect at CLP Fry Brook Substation.

37.5 MWCapacity
OperationalStatus
CTMarket
OtherTechnology

Project facts

Canonical namePlainfield Renewable Energy Project
Queue ID150
Statusoperational
Source statusC
MarketCT
TechnologyOther
Capacity37.5 MW
StateConnecticut
CountyWindham
Point of interconnectionCLP Fry Brook Substation
Requested (queue) date2006-05-25
Proposed in-service date
Operational date2013-12-12
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata