Plant Road BESS (27INR0343)

Plant Road BESS is a 200.7 MW battery interconnection project in Ector, Texas with a current status of withdrawn.

200.7 MWCapacity
WithdrawnStatus
EctorMarket
BatteryTechnology

Project facts

Canonical namePlant Road BESS
Queue ID27INR0343
Statuswithdrawn
Source status—
MarketEctor
TechnologyBattery
Capacity200.7 MW
StateTexas
CountyEctor
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date—
Withdrawn date2026-07-31
Developer—
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-31developerHorizon Energy Storage Greenfield Project Holdings LLC—low
2026-08-31poi_name1027 ODEHV 138kV—low
2026-08-31phaseSS Completed, FIS Started, No IA—low
2026-08-31operational_date2028-03-01—medium
2026-08-31withdrawn_date—2026-07-31high
2026-08-31statusoperationalwithdrawnhigh
2026-07-31new_project—operationalhigh

Explore related data

Source last checked2026-09-30
Data last materially changed2026-08-31
Page data generated2026-10-11

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata