Plummer Pipe (J2885)

Plummer Pipe is a 130.0 MW solar interconnection project in Red Lake, Minnesota with a current status of operational. It is proposed to connect at Plummer Pipe.

130.0 MWCapacity
OperationalStatus
—Market
SolarTechnology

Project facts

Canonical namePlummer Pipe
Queue IDJ2885
Statusoperational
Source statusActive
Market—
TechnologySolar
Capacity130.0 MW
StateMinnesota
CountyRed Lake
Point of interconnectionPlummer Pipe
Requested (queue) date2022-09-06
Proposed in-service date2025-01-10
Operational date2025-01-10
Withdrawn date—
Developer—
Utility / transmission ownerOtter Tail Power Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—operationalhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata