Poco - Menard 138kV Line Tao (J1030)

Poco - Menard 138kV Line Tao is a 150.0 MW solar interconnection project in Polk County, Texas with a current status of operational. It is proposed to connect at Poco - Menard 138kV Line Tao.

150.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical namePoco - Menard 138kV Line Tao
Queue IDJ1030
Statusoperational
Source statusDone
Market
TechnologySolar
Capacity150.0 MW
StateTexas
CountyPolk County
Point of interconnectionPoco - Menard 138kV Line Tao
Requested (queue) date2018-03-12
Proposed in-service date2021-09-01
Operational date2021-09-01
Withdrawn date
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata