POI-Galena 69 kV interconnection substation through a 0.50 mile 69 kV gen-tie line (GEN-2022-084)
POI-Galena 69 kV interconnection substation through a 0.50 mile 69 kV gen-tie line is a 11.4 MW solar interconnection project in Jasper, Missouri with a current status of withdrawn. It is proposed to connect at POI-Galena 69 kV interconnection substation through a 0.50 mile 69 kV gen-tie line.
Project facts
| Canonical name | POI-Galena 69 kV interconnection substation through a 0.50 mile 69 kV gen-tie line |
|---|---|
| Queue ID | GEN-2022-084 |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | MO |
| Technology | Solar |
| Capacity | 11.4 MW |
| State | Missouri |
| County | Jasper |
| Point of interconnection | POI-Galena 69 kV interconnection substation through a 0.50 mile 69 kV gen-tie line |
| Requested (queue) date | 2022-10-18 |
| Proposed in-service date | 2026-07-01 |
| Operational date | — |
| Withdrawn date | 2023-06-02 |
| Developer | — |
| Utility / transmission owner | EDE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | withdrawn | high |
Explore related data
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata