POI-Galena 69 kV interconnection substation through a 0.50 mile 69 kV gen-tie line (GEN-2022-084)

POI-Galena 69 kV interconnection substation through a 0.50 mile 69 kV gen-tie line is a 11.4 MW solar interconnection project in Jasper, Missouri with a current status of withdrawn. It is proposed to connect at POI-Galena 69 kV interconnection substation through a 0.50 mile 69 kV gen-tie line.

11.4 MWCapacity
WithdrawnStatus
MOMarket
SolarTechnology

Project facts

Canonical namePOI-Galena 69 kV interconnection substation through a 0.50 mile 69 kV gen-tie line
Queue IDGEN-2022-084
Statuswithdrawn
Source statusWITHDRAWN
MarketMO
TechnologySolar
Capacity11.4 MW
StateMissouri
CountyJasper
Point of interconnectionPOI-Galena 69 kV interconnection substation through a 0.50 mile 69 kV gen-tie line
Requested (queue) date2022-10-18
Proposed in-service date2026-07-01
Operational date
Withdrawn date2023-06-02
Developer
Utility / transmission ownerEDE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata