Ponferrada Solar (28INR0182)

Ponferrada Solar is a 148.9 MW solar interconnection project in Navarro, Texas with a current status of operational. It is proposed to connect at Tap 138 KV 3456 CORSWEST1_8 - 3457 CORS_MOBT_8 .

148.9 MWCapacity
OperationalStatus
NavarroMarket
SolarTechnology

Project facts

Canonical namePonferrada Solar
Queue ID28INR0182
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketNavarro
TechnologySolar
Capacity148.9 MW
StateTexas
CountyNavarro
Point of interconnectionTap 138 KV 3456 CORSWEST1_8 - 3457 CORS_MOBT_8
Requested (queue) date2024-10-01
Proposed in-service date
Operational date2029-04-06
Withdrawn date
DeveloperKarol Solar III
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.