Pontiac Midpoint 345kV is a 575.0 MW gas interconnection project in McLean, Illinois with a current status of withdrawn.

575.0 MWCapacity
WithdrawnStatus
—Market
GasTechnology

Project facts

Canonical namePontiac Midpoint 345kV
Queue IDAB1-086
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyGas
Capacity575.0 MW
StateIllinois
CountyMcLean
Point of interconnection—
Requested (queue) date2015-09-30
Proposed in-service date2019-06-01
Operational date—
Withdrawn date2017-04-27
Developer—
Utility / transmission ownerComEd

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.