Pontiac Midpoint-Dresden (AE1-184)

Pontiac Midpoint-Dresden is a 82.7 MW other interconnection project in Livingston, Illinois with a current status of withdrawn.

82.7 MWCapacity
WithdrawnStatus
Market
OtherTechnology

Project facts

Canonical namePontiac Midpoint-Dresden
Queue IDAE1-184
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyOther
Capacity82.7 MW
StateIllinois
CountyLivingston
Point of interconnection
Requested (queue) date2018-09-25
Proposed in-service date2022-06-01
Operational date
Withdrawn date2022-02-02
Developer
Utility / transmission ownerComEd

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.