Pontiac Midpoint-Wilton Center 345kV (O51)

Pontiac Midpoint-Wilton Center 345kV is a 300.0 MW wind interconnection project in Livingston, Illinois with a current status of operational.

300.0 MWCapacity
OperationalStatus
Market
WindTechnology

Project facts

Canonical namePontiac Midpoint-Wilton Center 345kV
Queue IDO51
Statusoperational
Source statusIn Service
Market
TechnologyWind
Capacity300.0 MW
StateIllinois
CountyLivingston
Point of interconnection
Requested (queue) date2005-07-27
Proposed in-service date
Operational date2010-05-06
Withdrawn date
Developer
Utility / transmission ownerComEd

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata