Poplar Grove 34kV (N20)

Poplar Grove 34kV is a 9.9 MW wind interconnection project in Boone, Illinois with a current status of withdrawn.

9.9 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical namePoplar Grove 34kV
Queue IDN20
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity9.9 MW
StateIllinois
CountyBoone
Point of interconnection
Requested (queue) date2005-01-06
Proposed in-service date2005-12-29
Operational date
Withdrawn date2005-02-17
Developer
Utility / transmission ownerComEd

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.