Port Everglades is a 296.0 MW gas interconnection project in Broward, Florida with a current status of operational.

296.0 MWCapacity
OperationalStatus
FPLMarket
GasTechnology

Project facts

Canonical namePort Everglades
Queue ID617_5A
Statusoperational
Source status(OP) Operating
MarketFPL
TechnologyGas
Capacity296.0 MW
StateFlorida
CountyBroward
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2016-04-01
Withdrawn date
Developer
Utility / transmission ownerFlorida Power & Light

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata