Porter 230kV Substation (J923)

Porter 230kV Substation is a 50.0 MW battery interconnection project in Montgomery County, Texas with a current status of withdrawn. It is proposed to connect at Porter 230kV Substation.

50.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical namePorter 230kV Substation
Queue IDJ923
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity50.0 MW
StateTexas
CountyMontgomery County
Point of interconnectionPorter 230kV Substation
Requested (queue) date2017-06-16
Proposed in-service date2020-09-15
Operational date2020-09-15
Withdrawn date2019-01-08
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata