Post Oak (04INR0011a)

Post Oak is a 200.0 MW wind interconnection project with a current status of operational.

200.0 MWCapacity
OperationalStatus
ERCOTMarket
WindTechnology

Project facts

Canonical namePost Oak
Queue ID04INR0011a
Statusoperational
Source statusoperational
MarketERCOT
TechnologyWind
Capacity200.0 MW
State
County
Point of interconnection
Requested (queue) date2005-10-19
Proposed in-service date2007-09-15
Operational date
Withdrawn date
DeveloperTexas Land Partners
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata