Post Wind Farm LP (56457_1)

Post Wind Farm LP is a 84.0 MW wind interconnection project in Borden, Texas with a current status of operational.

84.0 MWCapacity
OperationalStatus
ERCOMarket
WindTechnology

Project facts

Canonical namePost Wind Farm LP
Queue ID56457_1
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologyWind
Capacity84.0 MW
StateTexas
CountyBorden
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2006-04-01
Withdrawn date
Developer
Utility / transmission ownerFPL Energy Red Canyon LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.