Postrock to Axtell 345 kV line (GEN-2022-095)

Postrock to Axtell 345 kV line is a 250.0 MW wind interconnection project in Osborne, Kansas with a current status of withdrawn. It is proposed to connect at Postrock to Axtell 345 kV line.

250.0 MWCapacity
WithdrawnStatus
KSMarket
WindTechnology

Project facts

Canonical namePostrock to Axtell 345 kV line
Queue IDGEN-2022-095
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologyWind
Capacity250.0 MW
StateKansas
CountyOsborne
Point of interconnectionPostrock to Axtell 345 kV line
Requested (queue) date2022-11-15
Proposed in-service date2028-12-31
Operational date
Withdrawn date2023-11-06
Developer
Utility / transmission ownerITCGP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata