Potter-Gold 115kV is a 117.0 MW wind interconnection project in Potter, Pennsylvania with a current status of withdrawn.

117.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical namePotter-Gold 115kV
Queue IDAC1-187
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity117.0 MW
StatePennsylvania
CountyPotter
Point of interconnection
Requested (queue) date2016-10-31
Proposed in-service date2019-12-31
Operational date
Withdrawn date2018-06-20
Developer
Utility / transmission ownerAPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.