Powerline Energy Storage (69356_PWLNB)
Powerline Energy Storage is a 100.0 MW battery interconnection project in Citrus, Florida with a current status of active.
100.0 MWCapacity
ActiveStatus
FPCMarket
BatteryTechnology
Project facts
| Canonical name | Powerline Energy Storage |
|---|---|
| Queue ID | 69356_PWLNB |
| Status | active |
| Source status | (P) Planned for installation, but regulatory approvals not initiated |
| Market | FPC |
| Technology | Battery |
| Capacity | 100.0 MW |
| State | Florida |
| County | Citrus |
| Point of interconnection | — |
| Requested (queue) date | — |
| Proposed in-service date | 2027-03-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Duke Energy Progress |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-02 | new_project | — | active | high |
Explore related data
Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata