Powerline Road / 8POWERLN_RD% (338156) 500kV Substation (J3110)

Powerline Road / 8POWERLN_RD% (338156) 500kV Substation is a 400.0 MW solar interconnection project in Craighead, Arkansas with a current status of withdrawn. It is proposed to connect at Powerline Road / 8POWERLN_RD% (338156) 500kV Substation.

400.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical namePowerline Road / 8POWERLN_RD% (338156) 500kV Substation
Queue IDJ3110
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity400.0 MW
StateArkansas
CountyCraighead
Point of interconnectionPowerline Road / 8POWERLN_RD% (338156) 500kV Substation
Requested (queue) date2022-09-15
Proposed in-service date2026-06-30
Operational date2026-06-30
Withdrawn date2025-07-30
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata