Powerton-Goodings Grove 345kV (W2-046)

Powerton-Goodings Grove 345kV is a 450.0 MW wind interconnection project in Livingston, Illinois with a current status of withdrawn.

450.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical namePowerton-Goodings Grove 345kV
Queue IDW2-046
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity450.0 MW
StateIllinois
CountyLivingston
Point of interconnection
Requested (queue) date2010-06-30
Proposed in-service date2013-12-31
Operational date
Withdrawn date2011-12-07
Developer
Utility / transmission ownerComEd

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.