Powerton-Mole Creek (AF2-003)

Powerton-Mole Creek is a 303.0 MW wind interconnection project in Marshall, Illinois with a current status of withdrawn.

303.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical namePowerton-Mole Creek
Queue IDAF2-003
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity303.0 MW
StateIllinois
CountyMarshall
Point of interconnection
Requested (queue) date2019-10-01
Proposed in-service date2023-10-01
Operational date
Withdrawn date2020-08-24
Developer
Utility / transmission ownerComEd

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata