Powerton-Nevada 345 kV (AE1-163)

Powerton-Nevada 345 kV is a 350.0 MW wind interconnection project in Woodford, Illinois with a current status of active.

350.0 MWCapacity
ActiveStatus
Market
WindTechnology

Project facts

Canonical namePowerton-Nevada 345 kV
Queue IDAE1-163
Statusactive
Source statusUnder Construction
Market
TechnologyWind
Capacity350.0 MW
StateIllinois
CountyWoodford
Point of interconnection
Requested (queue) date2018-09-24
Proposed in-service date2027-02-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerComEd

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.