PPL Kings Park Ext. (0048)
PPL Kings Park Ext. is a 300.0 MW generation interconnection project with a current status of withdrawn. It is proposed to connect at Pilgrim.
300.0 MWCapacity
WithdrawnStatus
—Market
GenerationTechnology
Project facts
| Canonical name | PPL Kings Park Ext. |
|---|---|
| Queue ID | 0048 |
| Status | withdrawn |
| Source status | 0 |
| Market | — |
| Technology | Generation |
| Capacity | 300.0 MW |
| State | New York |
| County | — |
| Point of interconnection | Pilgrim |
| Requested (queue) date | 2000-02-10 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | PP&L Global, Inc. |
| Utility / transmission owner | LIPA |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata