Prairie Grove 69 kV Substation (GEN-2016-166)

Prairie Grove 69 kV Substation is a 35.0 MW solar interconnection project in Washington, Arkansas with a current status of withdrawn. It is proposed to connect at Prairie Grove 69 kV Substation.

35.0 MWCapacity
WithdrawnStatus
ARMarket
SolarTechnology

Project facts

Canonical namePrairie Grove 69 kV Substation
Queue IDGEN-2016-166
Statuswithdrawn
Source statusWITHDRAWN
MarketAR
TechnologySolar
Capacity35.0 MW
StateArkansas
CountyWashington
Point of interconnectionPrairie Grove 69 kV Substation
Requested (queue) date2016-11-29
Proposed in-service date
Operational date
Withdrawn date2020-02-21
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata