Pratt 115kV (GEN-2010-049)

Pratt 115kV is a 49.6 MW wind interconnection project in Pratt County, Kansas with a current status of withdrawn. It is proposed to connect at Pratt 115kV.

49.6 MWCapacity
WithdrawnStatus
KSMarket
WindTechnology

Project facts

Canonical namePratt 115kV
Queue IDGEN-2010-049
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologyWind
Capacity49.6 MW
StateKansas
CountyPratt County
Point of interconnectionPratt 115kV
Requested (queue) date2010-09-30
Proposed in-service date
Operational date
Withdrawn date2012-03-22
Developer
Utility / transmission ownerMKEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata