Pratt Wind Farm 345 kV Substation (GEN-2023-215)

Pratt Wind Farm 345 kV Substation is a 225.0 MW battery interconnection project in Pratt, Kansas with a current status of withdrawn. It is proposed to connect at Pratt Wind Farm 345 kV Substation.

225.0 MWCapacity
WithdrawnStatus
KSMarket
BatteryTechnology

Project facts

Canonical namePratt Wind Farm 345 kV Substation
Queue IDGEN-2023-215
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologyBattery
Capacity225.0 MW
StateKansas
CountyPratt
Point of interconnectionPratt Wind Farm 345 kV Substation
Requested (queue) date2023-10-02
Proposed in-service date2027-06-01
Operational date
Withdrawn date2023-11-29
Developer
Utility / transmission ownerNEET

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata