NEET — Interconnection Queue Projects
NEET is associated with 10 tracked interconnection projects representing 2,850 MW of requested capacity.
Entity resolution: single source organization name; no cluster merge applied.
10Projects
1Active
1Operational
8Withdrawn
2,850 MWRequested capacity
0Markets
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Solar | 6 | 1,862 MW |
| Wind | 3 | 762 MW |
| Battery | 1 | 225 MW |
Geographic footprint
| State | Projects |
|---|---|
| New Mexico | 4 |
| Kansas | 3 |
| Missouri | 2 |
| Texas | 1 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Crossroads - Hobbs 345 kV Line | GEN-2023-081 | Solar | 625.0 MW | withdrawn | Lea, New Mexico |
| Tap on Crossroad to Hobbs 345kV | CPP-2028-001 | Solar | 400.0 MW | operational | Houston, Texas |
| Crossroads - Hobbs 345 kV Line | GEN-2023-201 | Solar | 300.0 MW | withdrawn | Lea, New Mexico |
| Crossroads - Hobbs 345 kV Line | GEN-2022-160 | Wind | 280.0 MW | withdrawn | Chaves And Lea, New Mexico |
| Crossroads - Hobbs 345 kV Line | GEN-2022-159 | Wind | 280.0 MW | withdrawn | Chaves And Lea, New Mexico |
| Pratt Wind Farm 345 kV Substation | GEN-2023-215 | Battery | 225.0 MW | withdrawn | Pratt, Kansas |
| Wolf Creek- Blackberry 345 kV Line Break | GEN-2023-006 | Wind | 202.0 MW | withdrawn | Barton, Vernon, Missouri |
| Wolf Creek- Blackberry 345 kV | GEN-2022-062 | Solar | 200.0 MW | withdrawn | Bourbon, Kansas |
| Wolf Creek - Blackberry 345 kV Tap | GEN-2022-054 | Solar | 200.0 MW | active | Bourbon, Kansas |
| Wolf Creek-Blackberry 345 kV | GEN-2022-053 | Solar | 137.5 MW | withdrawn | Barton, Missouri |
Recent material changes
No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.