Prescott Wind Farm is a 38.7 MW wind interconnection project in Adams, Iowa with a current status of operational.

38.7 MWCapacity
OperationalStatus
MISOMarket
WindTechnology

Project facts

Canonical namePrescott Wind Farm
Queue ID66952_PWE
Statusoperational
Source status(OP) Operating
MarketMISO
TechnologyWind
Capacity38.7 MW
StateIowa
CountyAdams
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2024-09-01
Withdrawn date—
Developer—
Utility / transmission ownerPrescott Wind Energy LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.