Adams County, Iowa — Interconnection Projects
The interXdata warehouse tracks 13 interconnection projects in Adams, Iowa, representing 855 MW of requested capacity.
13Total projects
0Active
10Operational
3Withdrawn
855 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Wind | 7 | 493 MW |
| Solar | 2 | 350 MW |
| Other | 3 | 7 MW |
| Gas | 1 | 5 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Creston-Adams County 161kV | J1533 | Solar | 200.0 MW | withdrawn | Adams, Iowa |
| Other_ | J3305 | Solar | 150.0 MW | withdrawn | Adams, Iowa |
| MISO Queue Project R66 — Wind in Adams, Iowa | R66 | Wind | 150.0 MW | withdrawn | Adams, Iowa |
| MISO Queue Project J343 — Wind in Adams, Iowa | J343 | Wind | 150.0 MW | operational | Adams, Iowa |
| Adams Wind | 59637_ADWF3 | Wind | 58.0 MW | operational | Adams, Iowa |
| Adams Wind | 59637_ADWF4 | Wind | 48.3 MW | operational | Adams, Iowa |
| Adams Wind | 59637_ADWF2 | Wind | 43.3 MW | operational | Adams, Iowa |
| Prescott Wind Farm | 66952_PWE | Wind | 38.7 MW | operational | Adams, Iowa |
| POET Biorefining LLC - Corning | 63919_1 | Gas | 5.0 MW | operational | Adams, Iowa |
| Adams Wind | 59637_ADWF | Wind | 4.7 MW | operational | Adams, Iowa |
| Corning | 1134_5 | Other | 2.8 MW | operational | Adams, Iowa |
| Corning | 1134_6 | Other | 2.0 MW | operational | Adams, Iowa |
| Corning | 1134_7 | Other | 2.0 MW | operational | Adams, Iowa |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in Adams County.