Procter & Gamble Power Plant (7551_CCST)

Procter & Gamble Power Plant is a 49.8 MW gas interconnection project in Sacramento, California with a current status of operational.

49.8 MWCapacity
OperationalStatus
BANCMarket
GasTechnology

Project facts

Canonical nameProcter & Gamble Power Plant
Queue ID7551_CCST
Statusoperational
Source status(OP) Operating
MarketBANC
TechnologyGas
Capacity49.8 MW
StateCalifornia
CountySacramento
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date1997-03-01
Withdrawn date—
Developer—
Utility / transmission ownerSacramento Municipal Util Dist

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.