PJM Queue Project AH1-559 — Battery in Will, Illinois

PJM Queue Project AH1-559 — Battery in Will, Illinois is a 250.0 MW battery interconnection project in Will, Illinois with a current status of withdrawn.

250.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical namePJM Queue Project AH1-559 — Battery in Will, Illinois
Queue IDAH1-559
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity250.0 MW
StateIllinois
CountyWill
Point of interconnection
Requested (queue) date2021-09-10
Proposed in-service date2025-06-01
Operational date
Withdrawn date2021-11-01
Developer
Utility / transmission ownerComEd

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata