Project Alpha Solar (29INR0189)

Project Alpha Solar is a 122.0 MW solar interconnection project in Hopkins, Texas with a current status of operational. It is proposed to connect at 138 kV COOPER LAKE PUMP TAP bus# 1822 ---- 138 KV #1814 SULPHUR SPRINGS.

122.0 MWCapacity
OperationalStatus
HopkinsMarket
SolarTechnology

Project facts

Canonical nameProject Alpha Solar
Queue ID29INR0189
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketHopkins
TechnologySolar
Capacity122.0 MW
StateTexas
CountyHopkins
Point of interconnection138 kV COOPER LAKE PUMP TAP bus# 1822 ---- 138 KV #1814 SULPHUR SPRINGS
Requested (queue) date2025-09-09
Proposed in-service date
Operational date2029-09-24
Withdrawn date
DeveloperSGE Alpha Energy LLC
Utility / transmission ownerERCOT

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata