Project Alpha Solar is a 122.0 MW solar interconnection project in Hopkins, Texas with a current status of operational. It is proposed to connect at 138 kV COOPER LAKE PUMP TAP bus# 1822 ---- 138 KV #1814 SULPHUR SPRINGS.
122.0 MWCapacity
OperationalStatus
HopkinsMarket
SolarTechnology
Project facts
| Canonical name | Project Alpha Solar |
|---|---|
| Queue ID | 29INR0189 |
| Status | operational |
| Source status | SS Completed, FIS Started, No IA |
| Market | Hopkins |
| Technology | Solar |
| Capacity | 122.0 MW |
| State | Texas |
| County | Hopkins |
| Point of interconnection | 138 kV COOPER LAKE PUMP TAP bus# 1822 ---- 138 KV #1814 SULPHUR SPRINGS |
| Requested (queue) date | 2025-09-09 |
| Proposed in-service date | — |
| Operational date | 2029-09-24 |
| Withdrawn date | — |
| Developer | SGE Alpha Energy LLC |
| Utility / transmission owner | ERCOT |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata