MISO Queue Project S1005 — Generation in an unlisted county, Wisconsin is a 60.0 MW generation interconnection project with a current status of operational.
60.0 MWCapacity
OperationalStatus
—Market
GenerationTechnology
Project facts
| Canonical name | MISO Queue Project S1005 — Generation in an unlisted county, Wisconsin |
|---|---|
| Queue ID | S1005 |
| Status | operational |
| Source status | Done |
| Market | — |
| Technology | Generation |
| Capacity | 60.0 MW |
| State | Wisconsin |
| County | — |
| Point of interconnection | — |
| Requested (queue) date | 2021-04-02 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | MISO |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28
Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata