MISO Queue Project S1037 — Generation in an unlisted county, the U.S.

MISO Queue Project S1037 — Generation in an unlisted county, the U.S. is a 50.4 MW generation interconnection project with a current status of withdrawn.

50.4 MWCapacity
WithdrawnStatus
Market
GenerationTechnology

Project facts

Canonical nameMISO Queue Project S1037 — Generation in an unlisted county, the U.S.
Queue IDS1037
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyGeneration
Capacity50.4 MW
State
County
Point of interconnection
Requested (queue) date2022-10-26
Proposed in-service date
Operational date
Withdrawn date2023-03-22
Developer
Utility / transmission ownerMISO

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata