MISO Queue Project S1037 — Generation in an unlisted county, the U.S.
MISO Queue Project S1037 — Generation in an unlisted county, the U.S. is a 50.4 MW generation interconnection project with a current status of withdrawn.
50.4 MWCapacity
WithdrawnStatus
—Market
GenerationTechnology
Project facts
| Canonical name | MISO Queue Project S1037 — Generation in an unlisted county, the U.S. |
|---|---|
| Queue ID | S1037 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | — |
| Technology | Generation |
| Capacity | 50.4 MW |
| State | — |
| County | — |
| Point of interconnection | — |
| Requested (queue) date | 2022-10-26 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | 2023-03-22 |
| Developer | — |
| Utility / transmission owner | MISO |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata