Pueblo BESS (24INR0581)
Pueblo BESS is a 9.9 MW battery interconnection project with a current status of withdrawn. It is proposed to connect at Load: 9.9MW_x000D_ Load Name or Load Transformer name: 138_12_2_x000D_ PTI Bus #: 8273_x000D_ Transmission-level voltage (high side kV): 138.
Project facts
| Canonical name | Pueblo BESS |
|---|---|
| Queue ID | 24INR0581 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | ERCOT |
| Technology | Battery |
| Capacity | 9.9 MW |
| State | — |
| County | — |
| Point of interconnection | Load: 9.9MW_x000D_ Load Name or Load Transformer name: 138_12_2_x000D_ PTI Bus #: 8273_x000D_ Transmission-level voltage (high side kV): 138 |
| Requested (queue) date | 2023-06-14 |
| Proposed in-service date | 2024-10-05 |
| Operational date | — |
| Withdrawn date | — |
| Developer | SBESS TX 3, LLC |
| Utility / transmission owner | ERCOT |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata