Purple Sage BESS 2 (25INR0392)

Purple Sage BESS 2 is a 156.0 MW other interconnection project in Collin, Texas with a current status of operational. It is proposed to connect at Anna 345 kV Bus# 2373.

156.0 MWCapacity
OperationalStatus
CollinMarket
OtherTechnology

Project facts

Canonical namePurple Sage BESS 2
Queue ID25INR0392
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketCollin
TechnologyOther
Capacity156.0 MW
StateTexas
CountyCollin
Point of interconnectionAnna 345 kV Bus# 2373
Requested (queue) date2023-03-08
Proposed in-service date
Operational date2028-02-12
Withdrawn date
DeveloperPurple Sage, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata