Quad Cities - Sterling Steel 345 kV (AG2-674)

Quad Cities - Sterling Steel 345 kV is a 212.1 MW wind interconnection project in Whiteside, Illinois with a current status of withdrawn.

212.1 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameQuad Cities - Sterling Steel 345 kV
Queue IDAG2-674
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity212.1 MW
StateIllinois
CountyWhiteside
Point of interconnection
Requested (queue) date2021-03-31
Proposed in-service date2023-10-01
Operational date
Withdrawn date2024-12-18
Developer
Utility / transmission ownerComEd

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.