Quarry - Alexandria 345.0kV (J4162)

Quarry - Alexandria 345.0kV is a 300.0 MW battery interconnection project in Stearns, Minnesota with a current status of withdrawn. It is proposed to connect at Quarry - Alexandria 345.0kV.

300.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameQuarry - Alexandria 345.0kV
Queue IDJ4162
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity300.0 MW
StateMinnesota
CountyStearns
Point of interconnectionQuarry - Alexandria 345.0kV
Requested (queue) date2025-09-29
Proposed in-service date2028-04-03
Operational date2028-04-03
Withdrawn date2026-01-05
Developer
Utility / transmission ownerNORTHERN STATES POWER COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.