Quarter Ranch Solar (67078_GRS3)

Quarter Ranch Solar is a 154.1 MW solar interconnection project in Webb, Texas with a current status of active.

154.1 MWCapacity
ActiveStatus
ERCOMarket
SolarTechnology

Project facts

Canonical nameQuarter Ranch Solar
Queue ID67078_GRS3
Statusactive
Source status(L) Regulatory approvals pending. Not under construction
MarketERCO
TechnologySolar
Capacity154.1 MW
StateTexas
CountyWebb
Point of interconnection—
Requested (queue) date—
Proposed in-service date2028-10-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerGransolar Texas Three LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—activehigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-11

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata