Quinebaug Solar (588)

Quinebaug Solar is a 49.0 MW solar interconnection project in Windham, Connecticut with a current status of operational. It is proposed to connect at Killingly to Tunnel 115 kV line (approx 5.5 miles south of Brooklyn Substation) GPS Coordinates: - 71 55’ 27.9” W - 41 44’ 14.21” N.

49.0 MWCapacity
OperationalStatus
CTMarket
SolarTechnology

Project facts

Canonical nameQuinebaug Solar
Queue ID588
Statusoperational
Source statusC
MarketCT
TechnologySolar
Capacity49.0 MW
StateConnecticut
CountyWindham
Point of interconnectionKillingly to Tunnel 115 kV line (approx 5.5 miles south of Brooklyn Substation) GPS Coordinates: - 71 55’ 27.9” W - 41 44’ 14.21” N
Requested (queue) date2016-01-07
Proposed in-service date
Operational date2021-12-18
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata