r , (035046)
r , is a 74.9 MW solar interconnection project in Marion, Florida with a current status of withdrawn. It is proposed to connect at Dallas Airport to Wildwood City.
74.9 MWCapacity
WithdrawnStatus
FLMarket
SolarTechnology
Project facts
| Canonical name | r , |
|---|---|
| Queue ID | 035046 |
| Status | withdrawn |
| Source status | Withdrawn 12/31/2022 |
| Market | FL |
| Technology | Solar |
| Capacity | 74.9 MW |
| State | Florida |
| County | Marion |
| Point of interconnection | Dallas Airport to Wildwood City |
| Requested (queue) date | 2018-06-15 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | R&M Technologies |
| Utility / transmission owner | Duke Energy Progress |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata