r , (035046)

r , is a 74.9 MW solar interconnection project in Marion, Florida with a current status of withdrawn. It is proposed to connect at Dallas Airport to Wildwood City.

74.9 MWCapacity
WithdrawnStatus
FLMarket
SolarTechnology

Project facts

Canonical namer ,
Queue ID035046
Statuswithdrawn
Source statusWithdrawn 12/31/2022
MarketFL
TechnologySolar
Capacity74.9 MW
StateFlorida
CountyMarion
Point of interconnectionDallas Airport to Wildwood City
Requested (queue) date2018-06-15
Proposed in-service date—
Operational date—
Withdrawn date—
DeveloperR&M Technologies
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_project—withdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-10-11

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.