r , (035046)

r , is a 74.9 MW solar interconnection project in Marion, Florida with a current status of withdrawn. It is proposed to connect at Dallas Airport to Wildwood City.

74.9 MWCapacity
WithdrawnStatus
FLMarket
SolarTechnology

Project facts

Canonical namer ,
Queue ID035046
Statuswithdrawn
Source statusWithdrawn 12/31/2022
MarketFL
TechnologySolar
Capacity74.9 MW
StateFlorida
CountyMarion
Point of interconnectionDallas Airport to Wildwood City
Requested (queue) date2018-06-15
Proposed in-service date
Operational date
Withdrawn date
DeveloperR&M Technologies
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata