Rabun Gap (GI-052)

Rabun Gap is a 2.0 MW other interconnection project in Rabun County, Georgia with a current status of withdrawn. It is proposed to connect at Dillard Primary - Terrora Hydro 115 kV Line.

2.0 MWCapacity
WithdrawnStatus
GAMarket
OtherTechnology

Project facts

Canonical nameRabun Gap
Queue IDGI-052
Statuswithdrawn
Source statusIA Terminated
MarketGA
TechnologyOther
Capacity2.0 MW
StateGeorgia
CountyRabun County
Point of interconnectionDillard Primary - Terrora Hydro 115 kV Line
Requested (queue) date2008-07-21
Proposed in-service date2009-07-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Transmission

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: gtc-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.