Radar Hill Substation (L0421)

Radar Hill Substation is a 40.0 MW other interconnection project in Walla Walla, Washington with a current status of operational. It is proposed to connect at Scooteney Tap-Midway-Benton #1 115 kV.

40.0 MWCapacity
OperationalStatus
WAMarket
OtherTechnology

Project facts

Canonical nameRadar Hill Substation
Queue IDL0421
Statusoperational
Source statusENERGIZED
MarketWA
TechnologyOther
Capacity40.0 MW
StateWashington
CountyWalla Walla
Point of interconnectionScooteney Tap-Midway-Benton #1 115 kV
Requested (queue) date2017-11-07
Proposed in-service date
Operational date2020-11-07
Withdrawn date
DeveloperBig Bend Electric Cooperative, Inc.
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata