Rain Lily Solar 1 (27INR0288)

Rain Lily Solar 1 is a 147.8 MW solar interconnection project in Hood, Texas with a current status of operational. It is proposed to connect at Tap 138kV #350 ABBYBEND - #363 HOOD.

147.8 MWCapacity
OperationalStatus
HoodMarket
SolarTechnology

Project facts

Canonical nameRain Lily Solar 1
Queue ID27INR0288
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketHood
TechnologySolar
Capacity147.8 MW
StateTexas
CountyHood
Point of interconnectionTap 138kV #350 ABBYBEND - #363 HOOD
Requested (queue) date2025-02-25
Proposed in-service date
Operational date2028-10-15
Withdrawn date
DeveloperRain Lily Solar 1 LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata