Ramapo Storage Project 2 (1510)

Ramapo Storage Project 2 is a 500.0 MW battery interconnection project in Rockland, New York with a current status of withdrawn. It is proposed to connect at Ramapo Substation (345kV).

500.0 MWCapacity
WithdrawnStatus
GMarket
BatteryTechnology

Project facts

Canonical nameRamapo Storage Project 2
Queue ID1510
Statuswithdrawn
Source status0
MarketG
TechnologyBattery
Capacity500.0 MW
StateNew York
CountyRockland
Point of interconnectionRamapo Substation (345kV)
Requested (queue) date2023-02-02
Proposed in-service date2024-05-31
Operational date
Withdrawn date
DeveloperRamapo Storage Project 2
Utility / transmission ownerCONED

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata