Ramsey - Prairie 230kV Line Tap (J628)

Ramsey - Prairie 230kV Line Tap is a 400.0 MW wind interconnection project in Grand Forks County,Nelson County, North Dakota with a current status of withdrawn. It is proposed to connect at Ramsey - Prairie 230kV Line Tap.

400.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameRamsey - Prairie 230kV Line Tap
Queue IDJ628
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity400.0 MW
StateNorth Dakota
CountyGrand Forks County,Nelson County
Point of interconnectionRamsey - Prairie 230kV Line Tap
Requested (queue) date2017-06-16
Proposed in-service date2022-07-01
Operational date2022-07-01
Withdrawn date2021-11-09
Developer
Utility / transmission ownerGREAT RIVER ENERGY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.