GREAT RIVER ENERGY — Interconnection Queue Projects
GREAT RIVER ENERGY is associated with 92 tracked interconnection projects representing 13,325 MW of requested capacity.
Entity resolution: this utility / transmission entity rolls up 2 source organization name(s) that were auto-matched into a single canonical cluster. Attribution is inferred from source records and may include related special-purpose entities.
92Projects
3Active
58Operational
31Withdrawn
13,325 MWRequested capacity
1Markets
Capacity by technology
| Technology | Projects | Requested capacity |
|---|---|---|
| Wind | 18 | 3,855 MW |
| Solar | 23 | 3,612 MW |
| Gas | 16 | 2,073 MW |
| Battery | 13 | 1,722 MW |
| Other | 21 | 1,664 MW |
| Wind+Other | 1 | 400 MW |
Portfolio by market
| Market | Projects |
|---|---|
| MISO | 30 |
Geographic footprint
| State | Projects |
|---|---|
| Minnesota | 78 |
| North Dakota | 9 |
| Illinois | 1 |
| Kentucky | 1 |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| NOT IN DROPDOWN MENU | J3549 | Gas | 484.5 MW | withdrawn | Mower, Minnesota |
| Red Butte Wind | E0027 | Wind | 456.8 MW | active | Morton, North Dakota |
| ALEXANDRIA - BISON 345.0kV | J3762 | Solar | 430.0 MW | operational | Clay, Minnesota |
| Lyon County - Cedar Mountain 345 kV Circuit 2 Line | J1106 | Wind | 414.0 MW | withdrawn | Redwood County, Minnesota |
| Dickinson 345 kV, Buffalo, MN | S1036 | — | 400.0 MW | operational | McLean, North Dakota |
| Surplus; G876/G877 | S1036 | Wind+Other | 400.0 MW | active | Mclean, Illinois |
| Ramsey - Prairie 230kV Line Tap | J628 | Wind | 400.0 MW | withdrawn | Grand Forks County,Nelson County, North Dakota |
| Mud Lake - Benton County (GRE) 230kV | J4132 | Solar | 303.8 MW | withdrawn | Benton, Minnesota |
| BENTON COUNTY 345 - START DBL CKT W/EW LINE 345.0kV | J3884 | Solar | 300.0 MW | withdrawn | Benton, Minnesota |
| ALEXANDRIA - BISON 345.0kV | J4091 | Solar | 295.0 MW | withdrawn | Otter Tail, Minnesota |
| Pleasant Valley 161kV Substation | S1009 | — | 258.9 MW | operational | Minnesota |
| Other_ | J3346 | Wind | 250.0 MW | withdrawn | Lyon, Minnesota |
| Cherry Park Substation | J3235 | Battery | 250.0 MW | operational | Benton, Minnesota |
| Lyon County - Brookings County 345.0kV | J3894 | Battery | 250.0 MW | operational | Lyon, Minnesota |
| MISO Queue Project J4252 — Generation in an unlisted county, the U.S. | J4252 | — | 250.0 MW | operational | — |
| Cedar Mountain | J3259 | Battery | 250.0 MW | withdrawn | Renville, Minnesota |
| Mud Lake - Benton County (GRE) 230kV | J3275 | Wind | 249.0 MW | operational | Benton, Minnesota |
| ALEXANDRIA - BISON 345.0kV | J4148 | Solar | 245.0 MW | operational | Clay, Minnesota |
| ALEXANDRIA - BISON 345.0kV | J4147 | Solar | 245.0 MW | operational | Clay, Minnesota |
| Calamus East | S1140 | — | 200.0 MW | operational | Clinton, Minnesota |
| Pleasant Valley 345 kV Substation | J2022 | Solar | 200.0 MW | withdrawn | Mower, Minnesota |
| Cedar Mountain 345kV Substation | J726 | Wind | 200.0 MW | withdrawn | Cottonwood County, Minnesota |
| Cedar Mountain 345 kV Substation | J725 | Wind | 200.0 MW | withdrawn | Murray County, Minnesota |
| PANTHER | J1846 | Solar | 200.0 MW | operational | Renville, Minnesota |
| McHenry ND | J1754 | Wind | 200.0 MW | withdrawn | McHenry, North Dakota |
| Cedar Mountain - Lyon County 345.0kV | J3705 | Wind | 200.0 MW | withdrawn | Redwood, Minnesota |
| Cedar Mountain - Lyon County 345.0kV | J3704 | Battery | 200.0 MW | operational | Redwood, Minnesota |
| Stanton-McHenry 230kV | J746 | Wind | 200.0 MW | withdrawn | McHenry County,McLean County,Ward County, North Dakota |
| Nininger 115 kV | J4065 | Battery | 200.0 MW | operational | Dakota, Minnesota |
| MISO Queue Project J4250 — Generation in an unlisted county, the U.S. | J4250 | — | 200.0 MW | operational | — |
| ALEXANDRIA - BISON 345.0kV | J4129 | Wind | 200.0 MW | operational | Otter Tail, Minnesota |
| Elk River | 2039_CT | Gas | 191.3 MW | operational | Sherburne, Minnesota |
| Prairie - Ramsey 230 kV line | J897 | Wind | 190.0 MW | withdrawn | Grand Forks County, North Dakota |
| Cambridge CT Hybrid | 2038_GT2 | Gas | 169.2 MW | operational | Isanti, Minnesota |
| Pleasant Valley (MN) | 7843_11 | Gas | 167.5 MW | operational | Mower, Minnesota |
| Pleasant Valley (MN) | 7843_12 | Gas | 167.5 MW | operational | Mower, Minnesota |
| Stanton 230 kV Substation | J1187 | Wind | 151.8 MW | withdrawn | Mercer County, North Dakota |
| Cedar Mountain - Lyon County 345.0kV | J2053 | Wind | 151.5 MW | operational | Redwood, Minnesota |
| Rush City 230 kV | J3051 | Solar | 150.0 MW | operational | Chisago, Minnesota |
| Wing River-Riverton 230kV | J2433 | Solar | 150.0 MW | withdrawn | Wadena, Minnesota |
| CHUB LAKE - 304JB21/22 - HAMPTON - 8S50/51 345.0kV | J2027 | Solar | 150.0 MW | operational | Dakota, Minnesota |
| Ramsey - Prairie 230KV Line Tap | J889 | Wind | 150.0 MW | withdrawn | Nelson County, North Dakota |
| MISO Queue Project S1154 — Generation in an unlisted county, Minnesota | S1154 | — | 150.0 MW | operational | Minnesota |
| Wing River- Riverton 230kV line | J1221 | Solar | 150.0 MW | operational | Wadena County, Minnesota |
| Chub Lake 115 kV | J3543 | Battery | 135.0 MW | operational | Dakota, Minnesota |
| Pleasant Valley (MN) | 7843_13 | Gas | 132.8 MW | operational | Mower, Minnesota |
| ST BONIFACIUS | J3234 | Battery | 130.0 MW | withdrawn | Carver, Minnesota |
| ISANTTI TAP to ATHNSSW 69kV | J2030 | Solar | 120.0 MW | withdrawn | Isanti, Minnesota |
| Hutchinson Municipal - GRE Big Swan 115.0kV | J3552 | Solar | 112.0 MW | operational | McLeod, Minnesota |
| Spiritwood Station | 56786_1 | Gas | 106.2 MW | operational | Stutsman, North Dakota |
| Panther 230kV Substation | J556 | Wind | 102.0 MW | withdrawn | Renville County, Minnesota |
| Benton County 115kV Substation | J1426 | Solar | 100.0 MW | operational | Benton County, Minnesota |
| Dickinson Sub | J2092 | Wind | 100.0 MW | withdrawn | Wright, Minnesota |
| GRE-BENTON 7 115kV | S1088 | Battery | 100.0 MW | operational | Benton, Minnesota |
| GRE-NININGR7 115 kV | J3172 | Battery | 100.0 MW | operational | Dakota, Minnesota |
| SWENODA TAP - DUBLIN TAP - SS360 - 360WSM1 115.0kV | J3278 | Solar | 90.0 MW | withdrawn | Swift, Minnesota |
| Lakefield Junction | 7925_4 | Gas | 89.3 MW | operational | Martin, Minnesota |
| Lakefield Junction | 7925_1 | Gas | 89.3 MW | operational | Martin, Minnesota |
| Lakefield Junction | 7925_6 | Gas | 89.3 MW | operational | Martin, Minnesota |
| Lakefield Junction | 7925_5 | Gas | 89.3 MW | operational | Martin, Minnesota |
| Lakefield Junction | 7925_2 | Gas | 89.3 MW | operational | Martin, Minnesota |
| Lakefield Junction | 7925_3 | Gas | 89.3 MW | operational | Martin, Minnesota |
| Panther 230kV Substation | J1645 | Solar | 80.0 MW | withdrawn | Renville, Minnesota |
| Wing River Substation 230kV | J1597 | Solar | 75.0 MW | withdrawn | Wadena, Minnesota |
| RICE LAKE SWITCH ELSM11 - ZIMMERMAN TAP - SS2858 - ELS1 69.0kV | J3439 | Solar | 72.0 MW | operational | Sherburne, Minnesota |
| St Bonifacius | 6824_1 | Other | 61.2 MW | operational | Carver, Minnesota |
| ELK RIVER 14 | J3289 | Gas | 60.0 MW | operational | Sherburne, Minnesota |
| Hubbard 115kV | J1493 | Battery | 50.0 MW | withdrawn | Hubbard, Minnesota |
| Lake Koronis-Paynesville 69kV | J771 | Solar | 50.0 MW | withdrawn | Stearns County, Minnesota |
| Cable - Cable Tap 69kV Substation | J869 | Solar | 50.0 MW | withdrawn | Sherburne County, Minnesota |
| Elk River Station: S6 69 kV | R1005 | — | 49.0 MW | operational | Sherburne, — |
| Burna Tap - Joy 69.0kV | J2756 | Solar | 42.0 MW | operational | Livingston, Kentucky |
| Wing River- Riverton 230kV line | J1230 | Battery | 40.0 MW | withdrawn | Wadena County, Minnesota |
| CAMBRIDGE | J3465 | Gas | 40.0 MW | operational | Isanti, Minnesota |
| Tamarac | J2067 | Wind | 39.4 MW | withdrawn | Clay, Minnesota |
| Cambridge CT Hybrid | 2038_GT1 | Other | 25.1 MW | operational | Isanti, Minnesota |
| Maple Lake | 2042_5A | Other | 25.0 MW | operational | Wright, Minnesota |
| Rock Lake CT | 6741_1 | Other | 25.0 MW | operational | Pine, Minnesota |
| COVIL | J2116 | Gas | 18.0 MW | operational | Cook, Minnesota |
| Moon Lake 69kV Substation | J1037 | Battery | 15.0 MW | withdrawn | Murray County, Minnesota |
Recent material changes
| Observed | Project | Field | Old | New |
|---|---|---|---|---|
| 2026-08-09 | MISO Queue Project J4250 — Generation in an unlisted county, the U.S. | new_project | — | operational |
| 2026-08-09 | MISO Queue Project J4252 — Generation in an unlisted county, the U.S. | new_project | — | operational |
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Track queue activity connecting through GREAT RIVER ENERGY.
Start tracking with interXdata